Aerial view of a large lined landfill cell at dusk
Geosynthetic Lining Specialists

Specialist geosynthetic installation, clearly evidenced.

We install geomembrane and geosynthetic containment systems, and we document the work so the performance of the system can be verified, not assumed.

Direct deliveryQualified welders and our own delivery crews, directly managed and accountable.
Evidence-basedAn inspection and test plan agreed before deployment, held on site.
ResponseProject enquiries answered personally by our delivery team.
Why specialist execution matters

Containment performance is designed on paper and proven in the way it is built.

A lining system is only as good as the subgrade it sits on, the seams that join it, the details around every penetration and tie-in, and the tests that confirm all of it. These are execution decisions made on site, in sequence, under weather and program pressure.

The lining package is usually a modest part of the capital cost of a cell, dam or lagoon, and it carries a disproportionate share of the environmental and remediation consequence if it underperforms. Rectification after cover placement is slow, expensive and disruptive to operations.

Our answer is not a claim about outcomes. It is a method: qualified welders, an inspection and test plan agreed before deployment, hold points released only on evidence, and a documentation set that lets a third party retrace what was installed.

On landfill work, containment integrity meets or exceeds the BPEM standard and is signed off by an independent auditor, a higher bar than installer certification alone.

What Alygn does

Four service groups, delivered installation-only or supply and install.

01

Geomembrane installation

Deployment, welding and testing of HDPE and LLDPE geomembrane to cells, dams, ponds and capping systems, including batter work and anchor trenches.

02

Geosynthetic and composite systems

GCL, protection and separation geotextiles, drainage geocomposites, geogrids and cushion layers, installed in the sequence the design requires.

03

Detailing, penetrations and tie-ins

Pipe penetrations, sumps, concrete interfaces, structural tie-ins and connections to existing lined areas, detailed and tested individually.

04

Testing, repairs and documentation

Non-destructive and destructive seam testing, defect repair, non-conformance close-out and the handover documentation set.

Extrusion welding a geomembrane seam
Extrusion welding and seam detailing on site.
Proof and assurance

The process is the proof you can inspect first.

Our quality system is built around an inspection and test plan agreed with the client and, where appointed, the independent CQA consultant. Hold points are nominated before deployment and released on evidence.

Our inspection and test plans are built to meet or exceed construction quality assurance specifications approved by the EPA and following Victoria's BPEM landfill guidelines, and our landfill containment work is independently verified by the appointed environmental auditor.

Quality and technical assurance
ITP 01

Subgrade acceptance

Survey, surface finish and moisture verified and signed off before any material is deployed.

Hold point
ITP 02

Material conformance

Delivery inspection against roll numbers, conformance certificates and specification.

Witness
ITP 03

Trial welds

Each welder, each machine, each shift, with peel and shear results recorded before production welding.

Hold point
ITP 04

Panel deployment and seaming

Panel layout recorded as installed; seams logged against welder, machine and time.

Surveillance
ITP 05

Non-destructive testing

Air pressure, vacuum box and spark testing at the specified frequency, with repairs re-tested.

Hold point
ITP 06

Cover placement release

Liner surface inspected and released to the earthworks contractor in writing.

Hold point

Certification marks are not shown on this site until current certificates and permitted wording are verified. Prequalification and certification evidence is issued on request.

Alygn crew member operating compaction equipment on the liner
Markets

Three operating contexts, weighted by where we work today.

Environmental protection is the outcome across all three, not a separate market.

Aerial view of a lined landfill containment cell
Core market

Landfill and waste containment

Cell base and batter lining, capping, leachate and stormwater ponds. Composite liner systems built and documented to EPA Victoria's BPEM standard, with CQA independently verified and a full QA record at handover.

Rollers preparing the cell floor against a containment batter
Growth market

Mining, tailings and mine water

TSF and mine water storages, process ponds and heap pads, with interface and QA demands set by the tailings governance regime.

Aerial view of a lined water storage with adjacent pond
Active opportunity

Water infrastructure

Treatment lagoons, balance and evaporation ponds, and floating covers. Scope is confirmed project by project against the specified system.

Working with Alygn

Three ways to engage us, each suited to a different project.

Direct engagement

Direct with the asset owner

We contract directly for the lining package, installation only or supply and install, and interface with your earthworks and civil contractors.

Alygn signs, Alygn insures, Alygn is accountable for the specialist scope.

Subcontract package

Specialist subcontract

We work under head and civil contractors, inside your programme, systems, inductions and reporting requirements.

A documented confidentiality protocol applies, including where you compete with CRE Group.

Integrated delivery

Integrated with CRE Group

Where earthworks and lining are better sequenced under one delivery arrangement, CRE Group plant, haulage and civil capability is available.

Offered on request. It is not a condition of working with Alygn.

Alygn is a standalone business within CRE Group. We hold our own contracts and insurances, and we work for head contractors who compete with CRE under a documented confidentiality protocol. Where a project benefits from integrated earthworks and lining delivery, CRE capability is available on request.

Experience

Current work and team experience, precisely attributed.

Every entry states the contracting entity and the scope Alygn or an Alygn team member performed. Project references and CQA records are available on request.

Aerial view of composite lining across two landfill cells

Victoria

Composite lining across two engineered landfill cells, sequenced with bulk earthworks to accelerate delivery. Installation, testing and progressive CQA release maintained quality through each stage.

Scope
GCL, HDPE geomembrane and geotextile installation, testing and handover documentation
Delivery
Accelerated staging with progressive CQA release
Status
Cell 2 complete · Cell 3 ongoing
Aerial view of the lined landfill cell, South Australia

South Australia

Large-scale composite lining across Cells 7.1 and 7.2, sequenced with earthworks and progressively tested to maintain installation quality across approximately 278,323 m².

Scope
GCL, HDPE geomembrane, cushion geotextile, geogrid, drainage composite and separation geotextile installation
Delivery
Staged installation, seam testing and progressive CQA release
Status
Complete
Alygn geosynthetic lining works

Queensland

Project reference in preparation. Full scope and delivery detail available on request.

Scope
To be confirmed
Delivery
To be confirmed
Status
Project details to follow
Site photography to follow

New South Wales

Composite lining to the Cell 6 Stage 1A floor and northern batters, sequenced behind CRE self-delivered bulk earthworks, drill and blast and groundwater relief works across an 18,760 m² lined footprint.

Scope
GCL, 2 mm textured HDPE geomembrane, cushion geotextile, drainage geocomposite and separation geotextile, with compacted clay liner to rock walls, anchor trenches and leachate collection system
Delivery
Subgrade and engineered fill complete to CQA hold-point closure; geosynthetic installation commencing
Status
In delivery
Careers

Join the team installing the containment systems that hold.

We're always interested in hearing from qualified welders and experienced installation crew. Send your CV and we'll be in touch when a role suits.

Where it goes

Applications are sent to info@alygn.com.au and reviewed by the Alygn delivery team.

Sent to info@alygn.com.au.

Thanks. Your application has been sent to the Alygn team.
Submit project details

Tell us about the containment scope.

A few fields is all we need to give you a useful answer. Attach drawings or the specification if you have them.

What happens next

We review your details, confirm the scope and interfaces, and come back to you with a useful answer.

Prefer a technical conversation

Request a specialist call to discuss specification, interfaces or CQA arrangements.

Sent to info@alygn.com.au.

Thanks. Your enquiry has been sent. We will be in touch.